Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Power | 162KW/2000RPM |
Engine | Weichai brand |
Rated loading capacity | 5T |
Bucket capacity | 3cbm |
Operating weight | 16700kg |
Overall dimension (L×W×H) | 7880*3000*3250mm |
Maximum dumping height (blade plate) | 3400mm |
Corresponding dumping distance (blade plate) | 1260mm |
Maximum breakout force | 162KN |
Minimum turning radius | 6000mm |
Pilot valve | Single handle |
Maximum torque | 920Nm/2000rpm |
Wheel tread | 2150mm |
Wheel base | 3200mm |
Minimum ground clearance | 440mm |
Tyre size | 23.5-25-16pr |
Bucket ascending time | 6s |
Bucket dumping time | 1.5s |
Bucket ascending time | 4s |
Gears | Front 2, rear 1 |
Service brake | Air-push oil caliper disc brake |
Parking brake | Air break braking |
Forward speed | 38km/h |
Astern speed | 16.5km/h |
Bucket recovery angle | 48° |
Steering angle | 40° |
Dumping angle | 45° |
Gradeability | 30° |
Pre-sale Service
1 Answering customers' questions, helping customers choose the most suitable machines;
2.Making design drawings as per customers' requirements;
3. Providing quotations.
In-sale Service
1. Strictly control all procedures from raw materials sourcing to pre-assembly to ensure product quality;
2. Regularly updating production progress to clients;
3. After the production is completed, pre-assembly and test running will be carried out to make sure our machine works well;
4. Proper packing to minimize the risk that the machines are damaged during transportation;
5. Foundation drawing will be provided for clients to make the foundation in advance.
After-sale Service
1. Providing 7 * 24 hours online after-sales service every week
2. Providing related certificates, customs clearance documents, operation and maintenance instructions, installation videos, etc.
3. Arranging engineers to go to the client's job site. The engineers will help clients with the machine installation, machine test-running, and operators' training, etc.
4. Spare parts supply;
5. Job site visiting every year.