Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Overall parameter | |
Overall dimension | 9400x2500x3850mm |
Kerb weight | 14500kg |
Mixing Drum parameter | |
Mixing drum material | High quality wear-resistance steel |
Model:Q345 | |
Drum body thickness: 5mm, End cover thickness:6mm | |
Agitating capacity | 10M3 |
Drum overall dimension(with frame) | 7100*2500*2730mm |
Charging rate | ≥3 m3/min |
Top feed hopper dimension | ≥650 mm |
Discharging rate | ≥2 m3/min |
Residual rate | ≤0.5% |
Water supply | Baric water supply system |
Water tank capacity | 450L |
Radiator | 18L |
Reduction gear | PMB7Ysp Reducer, Italy technology |
Hydraulic pump | Eaton 54 America brand |
Hydraulic motor | Eaton 54 America brand |
Accessory | Tool box |
Chassis parameter | |
Chassis Brand | SINO Truck |
Chassis model | ZZ1257N3841W |
Axle base | 3825+1350 |
Driving type | Left hand drive(LHD) |
Engine model | WD615.69 |
Rated power (HP) | 336HP |
Emission standard | Euro II |
Fuel type | Diesel |
Transmission(Gear box) | HW13710 |
Front axle | Drum type |
Rear axle | HC16 Driving axle |
Tyre | 12.00R20(10+1) |
Cab type | HOWO 76 (with air-conditioner) |
Pre-sale Service
1 Answering customers' questions, helping customers choose the most suitable machines;
2.Making design drawings as per customers' requirements;
3. Providing quotations.
In-sale Service
1. Strictly control all procedures from raw materials sourcing to pre-assembly to ensure product quality;
2. Regularly updating production progress to clients;
3. After the production is completed, pre-assembly and test running will be carried out to make sure our machine works well;
4. Proper packing to minimize the risk that the machines are damaged during transportation;
5. Foundation drawing will be provided for clients to make the foundation in advance.
After-sale Service
1. Providing 7 * 24 hours online after-sales service every week
2. Providing related certificates, customs clearance documents, operation and maintenance instructions, installation videos, etc.
3. Arranging engineers to go to the client's job site. The engineers will help clients with the machine installation, machine test-running, and operators' training, etc.
4. Spare parts supply;
5. Job site visiting every year.