Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ITEM | SPECIFICATION | |
Whole performance of machine | Model | HBC80 |
Diesel engine power | 199KW | |
Diesel Engine Brand | Weichai | |
Oil cylinder inner diameter × stroke | Ф150×Ф100×1800mm | |
Concrete cylinder inner diameter × stroke | Ф200×1800mm | |
Hydraulic Main Oil Pump | Rexroth A11V260 | |
Oil pressure of system | 32MPa | |
Switch of H-pressure and L-pressure | Yes | |
Theoretical pumping pressure(H/L) | 20/10Mpa | |
Theoretical pumping frequency(H/L) | 16/29 times/min | |
Fuel tank capacity | 240L | |
Oil tank capacity | 580L | |
Cooling mode of hydraulic system | Fan cooling | |
Max. theoretical capacity(H/L) | 55/100 m3/h | |
125A pipe Max. Horizontal Pumping distance | 800m | |
125A pipe Max. Vertical (H-pressure) Pumping distance | 160m | |
Hopper capacity | 0.75m3 | |
Feeding height | ≤1500 mm | |
Concrete slump | 14~23 cm | |
Max. aggregate diameter | Crushed stone: 40 / Pebble: 50 mm | |
Valve | S Valve | |
Water pump for cleaning | 24V DC motor water pump | |
Concrete pipe cleaning mode | Water cleaning/dry cleaning | |
Water tank capacity | 200 L | |
Operation mode | Manual Non-wire | |
Lubrication mode | Automatic | |
Overall dimension | Length (mm) | 7550mm |
Width (mm) | 2350mm | |
Height (mm) | 2760mm | |
Full-load total weight | 12000Kg | |
Driving system | Chassis brand | Dongfeng |
Fuel tpye | Diesel | |
Displacement/Power | 3.767/118 L/KW | |
Engine | Yuchai | |
Engine Model | YC4S140-50 | |
Displacement standard | National V | |
Tyre model | 750 | |
Axle base | 3.8m | |
Max. driving speed | 100Km/h |
Pre-sale Service
1 Answering customers' questions, helping customers choose the most suitable machines;
2.Making design drawings as per customers' requirements;
3. Providing quotations.
In-sale Service
1. Strictly control all procedures from raw materials sourcing to pre-assembly to ensure product quality;
2. Regularly updating production progress to clients;
3. After the production is completed, pre-assembly and test running will be carried out to make sure our machine works well;
4. Proper packing to minimize the risk that the machines are damaged during transportation;
5. Foundation drawing will be provided for clients to make the foundation in advance.
After-sale Service
1. Providing 7 * 24 hours online after-sales service every week
2. Providing related certificates, customs clearance documents, operation and maintenance instructions, installation videos, etc.
3. Arranging engineers to go to the client's job site. The engineers will help clients with the machine installation, machine test-running, and operators' training, etc.
4. Spare parts supply;
5. Job site visiting every year.